What Each LSR Mold Trial Should Prove

By Dynne November 3rd, 2026 62 views

Most buyers receive a box of samples and a short email: "T1 samples are ready, please confirm." The parts look good, so they approve. Three months later, mass production shows flash on one cavity, a dimension drifting out of tolerance, or a cycle time 30% longer than quoted.

The problem is rarely the mold alone. It is that each trial stage was approved without knowing what it was supposed to prove. This article explains the purpose of each stage for liquid silicone rubber (LSR) tooling and what evidence buyers should ask for.

Why LSR trials need more care than plastic trials

LSR behaves differently from thermoplastics. It has very low viscosity, so it flashes into gaps as small as a few microns. It cures by heat inside a hot mold rather than solidifying as it cools. And it shrinks after demolding and again during post-cure.

That means a part can look perfect at the press and still change size after post-cure. It also means a mold that fills well with a hand-adjusted process may not repeat once the process is locked. Trials must test repeatability, not just appearance.

What each stage should prove

Stage

Main purpose

Buyer should receive

Approve if

T0

Mold runs; filling and venting checked

Short-shot study, photos of first full parts

Not for approval — internal check

T1

Part geometry and function

Full dimensional report per cavity, process sheet, samples

Dimensions and function meet drawing, or deviations are listed with a fix plan

T2 (and later)

Corrections verified

Re-measured dimensions on corrected features, change log

All T1 issues closed

Pre-production run

Stability at production settings

Capability data on key dimensions, cycle time, scrap rate

Process is stable and repeatable

T0: the mold's first breath

T0 is an internal trial. The molder checks that the mold opens, closes and fills, that vents work, and that the cold runner and needle valves behave. A short-shot study, filling the cavity in steps, shows where material flows last and where air may be trapped.

Buyers rarely need T0 samples. But it is reasonable to ask for short-shot photos. They reveal whether venting and gate position were designed correctly.

T1: the first real approval point

T1 is where geometry is judged. For a multi-cavity LSR mold, insist on measurement of every cavity, not one "best" part. Cavity-to-cavity differences are common and only show up when each is measured.

Ask that T1 parts be measured after post-cure, using the same post-cure profile planned for production. Measuring before post-cure is one of the most common reasons approved samples do not match mass production.

A T1 report should include:

  • Dimensional results for each cavity against drawing tolerances
  • Flash check on parting lines, shut-offs and vents
  • The process sheet: mold temperature, injection speed, shot size, cure time
  • Measured cycle time compared with the quoted cycle time
  • A list of deviations with proposed steel corrections

T2 and beyond: closing the gaps

T2 exists to confirm corrections. The report should focus on features that changed and show they now meet the drawing. Ask for a change log listing what steel was cut or added, so the tooling history stays traceable.

If T2 introduces new problems, do not skip ahead. Each extra trial is far cheaper than repairing a mold after mass production has started.

Pre-production: proving the process, not the part

A pre-production run, often a few hundred to a few thousand shots, tests whether the mold and process stay stable for hours, not minutes. This is where you confirm:

  • Key dimensions stay within tolerance across the run
  • Flash does not grow as the mold heats up fully
  • Demolding, by robot or manually, works reliably
  • The actual cycle time and scrap rate support the quoted part price

For medical, baby care and automotive parts, this run is also where capability data on critical dimensions is collected.

A simple sign-off rule

Approve a stage only when you know what it was meant to prove and you have seen evidence that it did. Appearance is not evidence. Measurements, process sheets and run data are.

At TYM, every LSR mold trial comes with a cavity-by-cavity dimensional report and the process sheet used. To plan validation for your next silicone part, contact our engineering team at sales@tymmold.com.

Venting an LSR Mold: Why a Few Microns Change Everything
Previous
Venting an LSR Mold: Why a Few Microns Change Everything
Read More
Expects To Provide You With Perfect Service

Expects To Provide You With Perfect Service

Our design team is highly experienced in handling complex design requirements.
Name *
Email *
Phone
Company
Message
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie. privacy